| 1 | W5J9JE-18-C-0009 | Design, Supply, Installation, and Commissioning of Medium & Low Voltage Electrical Networks for KMTC | Kabul, Afghanistan | USACE | 2018–2020 | JV Partner | Electrical Infrastructure |
| 2 | W5J9JE-16-C-0018 | Design and Construction of Water Storage, Pump Stations, and Supply Line, HKIA | HKIA, Afghanistan | USACE | 2016–2018 | QGG JV SWC | Water Infrastructure |
| 3 | W5J9JE-16-C-0033 | Construction and Design Build Project: New Women’s Compound at RTC ANCOP, Gardez | Gardez, Afghanistan | USACE | 2017–2019 | Sub from SWC | Integrated Infrastructure |
| 4 | W5J9JE-17-C-0005 | ANA MeS A-29 Repair Taxiway, Mazar-e-Sharif | Mazar-e-Sharif, Afghanistan | USACE | 2017–2019 | Sub from SWC | Heavy Civil / Paved Drainage |
| 5 | W5J9JE-16-C-0028 | ANA SMW GSK Remodel HQ (SHKIA) | Kabul, Afghanistan | USACE | 2018–2019 | QGG JV SWC | Control System Integration |
| 6 | W5J9JE-16-C-0030 | New Daycare & Billet Facility at AUP PHQ Nangarhar | Nangarhar, Afghanistan | USACE | 2016–2020 | Sub from SWC | Facility Construction |
| 7 | W5J9JE-16-C-0011 | ANP WPP Renov B108 & B111, Gardez (ANP-16-007) | Gardez, Afghanistan | USACE | 2016–2018 | Sub from SWC | Water Plant Refurbishment |
| 8 | W5J9JE-16-C-0006 | RTC Pamir HQ WPP | Mazar-e-Sharif, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Water Production Plant |
| 9 | W5J9JE-16-C-0009 | ANP WPP Refurb ABP 503, Kandahar | Kandahar, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Water Plant Refurbishment |
| 10 | W5J9JE-16-C-0010 | A-29 Combat Aircraft Parking Area and Munitions Storage at Panther Ramp | Kandahar, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Heavy Civil / Paved Drainage |
| 11 | W5J9JE-16-C-0017 | SMW GSK Paving Ramp 5 SHKIA | Kabul, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Heavy Civil / Paving |
| 12 | W5J9JE-16-C-0032 | ANP WPP Pamir | Mazar-e-Sharif, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Water Production Plant |
| 13 | W5J9JE-16-C-0004 | ANP WPP Refurb ABP 503 | Mazar-e-Sharif, Afghanistan | USACE | 2016 | QGG Design / SWC Build | Water Plant Refurbishment |
| 14 | W5J9JE-17-D-0002 | GCPSU ATF444 Repairs and Upgrades Kandahar | Kandahar, Afghanistan | USACE | 2017 | QGG Design / SWC Build | Utility System Upgrades |
| 15 | W5J9JE-19-F-0141 | ANA GSK-Central Darulaman | Kabul, Afghanistan | USACE | 2019 | QGG Design / SWC Build | Facility Construction |
| 16 | SOL-306-14-000033 | Emergency Operation and Maintenance Support | Badakhshan (14 villages), Afghanistan | USAID | 2016 | Prime | Road & Drainage |
| 17 | 1011124 | Upgrading BiBi Hogai Mosque Abasquli Village Streets | Kabul, Afghanistan | UNOPS | 2024 | Prime | Civil Works / Drainage |
| 18 | Goldenstar025-WJ9JE-01 | Golden Star Hotel Renovation (Electrical, Plumbing, General Renovation) | Kabul, Afghanistan | Private | 2025 | Prime | Building Renovation / MEP |
| 19 | 4700029514 | Establishment of Solid Waste Management Yard at UNAMA/UNOCA Compound | Kabul, Afghanistan | UNAMA | 2024 | Prime | Facility Construction |
| 20 | 1007689 | Construction of Manzal Bagh Plum Concrete Streets | Kandahar, Afghanistan | UNOPS | 2023 | Prime | Civil Works / Drainage |
| 21 | 1007660 | Upgrading of Maktab Street, Abo Bakre Sediq Mosque Street, Khalid Bin Walid Mosque Street, Gull Street | Kabul, Afghanistan | UNOPS | 2023 | Prime | Civil Works / Drainage |
| 22 | 1011848 | Upgrading of Near Tebe Adli & Imam Azam Mosque Streets with Plum Concrete Surface | Kabul, Afghanistan | UNOPS | 2024 | Prime | Civil Works / Drainage |
| 23 | W917PM-08-C-0019 | Uniformed Police District Headquarters | Badakhshan, Afghanistan | USACE | 2012 | QGG (Design) | Facility Design |
| 24 | W917PM-07-D-0020 | Life Support Area Utilities | Bagram, Afghanistan | USACE | 2012 | QGG (Design) | Utility Systems Design |
| 25 | W917PM-06-C-0040 | CID & CT Provincial Police HQ Building | Paktiya, Afghanistan | USACE | 2012 | QGG (Design) | Facility Design |
| 26 | W917PM-07-D-0019-0020 | ANP Site Adapt, BP Company, Dangam Kunar | Kunar, Afghanistan | USACE | 2012 | QGG (Design) | Facility Design |
| 27 | W5KA4N-10-C-0088 | Range Construction at Farah | Farah, Afghanistan | USACE | 2011 | QGG (Design) | Facility Design |
| 28 | W917PM-08-C-0027 | ANA Garrison Facility Farah | Farah, Afghanistan | USACE | 2012 | QGG (Design) | Facility Design |
| 29 | W917PM-07-D-0019-0011 | Regional Logistic Compound (RLC) | Gardiz, Afghanistan | USACE | 2012 | QGG (Design) | Facility Design |
| 30 | — | ANCOP Urban Battalion (Ghazi Urban Conceptual) | Afghanistan | USACE | 2013 | QGG (Design) | Urban Facility Design |
| 31 | W5J9JE-10-C-0017 | ANA Regional Military Training Center | Herat, Afghanistan | USACE | 2013 | QGG (Design) | Training Facility Design |
| 32 | W917PM-07-D-0020-0006 | Comprehensive Health Clinic Plus | Jalalabad, Afghanistan | USACE | 2013 | QGG (Design) | Healthcare Facility Design |
| 33 | W917PM-07-D-0015-0010 | Counter Narcotics Police of Afghanistan HQ | Kabul, Afghanistan | USACE | 2012 | QGG (Design) | Facility / Water Integration |
| 34 | W917PM-07-D-0015-0001 | CNPA Headquarters AMS Facilities | Kabul, Afghanistan | USACE | 2012 | QGG (Design) | Industrial Water Systems |
| 35 | — | NDS-Shashdarak Project | Kabul, Afghanistan | NDS | 2013 | QGG (Design) | Security Facility Design |
| 36 | W91B4L-10-C-0101 | Kandahar Air Field Maintenance Facility | Kandahar, Afghanistan | USACE | 2014 | QGG (Design) | Industrial Facility / Water |
| 37 | — | Construct TF 373 Compound Part 1 | Kandahar, Afghanistan | USACE | 2013 | QGG (Design) | Facility Design |
| 38 | — | KAF TPE Team 3 Modular Office | Kandahar, Afghanistan | USACE | 2013 | QGG (Design) | Modular Facility Design |
| 39 | W917PM-08-D-0002-0001 | ANA Security Upgrades to KMTC-West | Kabul, Afghanistan | USACE | 2013 | QGG (Design) | Secure Water Infrastructure |
| 40 | — | Afghan National Police Program (ANP) | Kunduz, Afghanistan | USACE | 2014 | QGG (Design) | Regional Facility Design |
| 41 | W917PM-07-D-0019-0012 | ANA Garrison Upgrades Lashkar Gah | Helmand, Afghanistan | USACE | 2013 | QGG (Design) | Water System Rehabilitation |
| 42 | W917PM-07-D-0019-0002 | Water Supply for Surobi/Mashal Kamal | Surobi District, Kabul, Afghanistan | USACE | 2013 | QGG (Design) | Rural Water Supply |
| 43 | W917PM-07-D-0015-0008-001 | ANA Garrison Upgrades – North Region | Mazar-e-Sharif, Afghanistan | USACE | 2013 | QGG (Design) | Regional Water Infrastructure |
| 44 | W917PM-08-C-0059 | ANA Garrison Facility Delaram | Nimroz, Afghanistan | USACE | 2014 | QGG (Design) | Arid Environment Water |
| 45 | W917PM-07-D-0019-0013 | ANA Garrison Upgrades Qalat | Zabul, Afghanistan | USACE | 2012 | QGG (Design) | Climate-Adaptive Water |
| 46 | — | Construction of AHP Checkpoints | Spin Boldak, Afghanistan | USACE | 2013 | QGG (Design) | Border Facility Design |
| 47 | W917PM-06-C-0043 | Border Police Battalion H.Q. | Tarinkot & Shahidan, Afghanistan | USACE | 2013 | QGG (Design) | Dual-Site Water Infrastructure |
| 48 | W917PM-07-D-0015-0007 | Uniformed Police Provincial Headquarters | Zabul, Afghanistan | USACE | 2013 | QGG (Design) | Provincial Water Systems |
| 49 | W917PM-07-C-0006 | Hospital Addition at ANA Garrison Kandahar | Kandahar, Afghanistan | USACE | 2012 | QGG (Design) | Medical Water Systems |
| 50 | W917PM-07-C-0007 | Hospital Addition at ANA Garrison Gardiz | Gardiz, Afghanistan | USACE | 2013 | QGG (Design) | Water Infrastructure Integration |
| 51 | — | Design of DUA Speciality Hospital (410-bed) | Jalalabad, Afghanistan | DUA Hospital | 2019 | Prime (Design) | Healthcare Facility Design |
| 52 | — | Design of Amiri Medical Complex | Kabul, Afghanistan | Amiri Medical | 2022 | Prime (Design) | Healthcare Facility Design |
| 53 | — | Design of Ariana Medical Complex | Kabul, Afghanistan | Ariana Medical | 2018 | Prime (Design) | Healthcare Facility Design |
| 54 | AF10/ITB/25/0002 | Construction of Remaining Works of Brick Masonry Family Health Houses in Helmand (FHH-HMD-03) | Helmand, Afghanistan | Min. Public Health | 2025 | Prime | Healthcare Facility Construction |